• The site migration is complete! Hopefully everything transferred properly from the multiple decades old software we were using before. If you notice any issues please let me know, thanks! Also, I'm still working on things like chatbox, etc so hopefully those will be working in the next week or two.

finally



moved some stuff around. dropped the bottle down to the spare well. mounted the switches in a temp location. waiting on my new hose to get here now. running the line out the bottom grommet in the spare well and in the empty spot in the fuel line racks. gonna be clean as hell when done but itll be a while seeing as i just broke my hand and ill be out of the country for a month or so soon. anyhow heres some pic
IMAG0256.jpg


IMAG0285-2.jpg


IMAG0369-1.jpg

new intake. got the nozzle mounted in the white pvc section now
 
update: finally got my hand better enough to do some work. made a new mount for my gauges and switchs out of a harder material. got eveything wired up and the giggle switch installed. will be filling the bottle and hitting the track on the 29th. few pics:
IMAG0576.jpg

switches off

IMAG0575.jpg

switches on

IMAG0570.jpg

installin the giggle button

IMAG0577.jpg

finished product
 




Will do cliff. And the bottle isn't mounted there. That was just a mock up the first day I got it. Its down in the spare well as of now
 