Projected 4 wheels back on ground next sunday or sooner. New alternator will be the last thing. After 2 days of stalling on the break lines because I kept scaring myself............... 2 fronts are routed to their locations. Final strapping of the lines will happen when all 4 are done. I love this flaring tool, flaring the copper/nickle line is a joke almost like play dough.
Cut
Uploaded with ImageShack.us
Flare, this is step one bubble flare, step 2 produced the double flare.
Uploaded with ImageShack.us
This is how I mounted the flare to the vise and vise to the ground haha. 2 6" bolts inbetween, secure enough for this manly man.
Uploaded with ImageShack.us
Walla your double.
Uploaded with ImageShack.us
Uploaded with ImageShack.us
Walla a bubble flare, this goes to the flex line to the calipers.
Uploaded with ImageShack.us
The 4 lines going to the abs looked great, so I decided to keep the oem flex line and flared that end into a threaded coupling.
Uploaded with ImageShack.us
Flared again into the new line and walla
Uploaded with ImageShack.us
Completed front driver side. I did the easy one first
Uploaded with ImageShack.us
Have to wait for my SS flex lines to come